Eastlink Resurfacing Project
Sector: Construction
Location: Melbourne, Victoria
Clients: ConnectEast , Downer Group
Services: Construction survey, As-built
Completion date: March 2024
Data: As-built, Setout plans, Plans
Landair Surveys supported ConnectEast and Downer Group in the resurfacing of Eastlink, contributing over 2,500 surveying hours across three consecutive summers. Using mobile laser scanning, Landair conducted rolling straight-edge analyses to simulate ride smoothness and assisted in planning meetings during the tendering process. As part of the resurfacing, our team worked in rotating night shifts to measure asphalt removal and resurfacing extents, reinstate toll-point markers and provide QA checks to guide the next day’s operations.
Daily progress plans ensured smooth project execution, while historical monitoring points were reinstated at key interchanges for long-term evaluation. With a partnership dating back to 2004, Landair’s expertise in road surface analysis and spatial data has been integral to Eastlink’s development and ongoing maintenance.
Services
Existing conditions surveys
As-constructed pickups
Quality assurance checks
Toll-point reinstatement setout surveys
Key outcomes
- Road analysis plans
- As-built survey plans
- Setout plans