Werribee Landfill

Landair Surveys has supported Werribee Landfill operations for over 25 years, addressing complex challenges with innovative solutions. Key contributions include creating an archive of 25 whole-site aerial ortho-images spanning from 1997 to 2024, providing invaluable historical data for site management and decision-making.

To support Cell 5 the largest landfill cell constructed in Victoria as of 2020, Landair conducted weekly drone flyovers to monitor material volumes and optimise stockpile management. Additionally, Landair integrated decades of disparate data sets into a unified composite base for methane gas well drilling, ensuring accurate depth pegging to protect cell floor liners. These solutions enhance operational efficiency, safety and environmental compliance.

Services

Volumetric surveys
Mapping surveys (crewed aircraft, drone and walkover surveys)  
Gas infrastructure surveys  
Progressive capping surveys  
Cell analysis surveys 

Project facts

Key outcomes

Related projects

Gas line survey

Cosgrove Landfills

Landair Surveys has played a key role in managing and aligning historical data for Cosgrove’s three landfill sites, creating a comprehensive spatial data file to serve as a single point of reference.

Lucas Heights

Lucas Heights Landfill

Landair Surveys provides regular drone flyovers at Lucas Heights Landfill to monitor waste movement and airspace consumption.

Cell construction

Sunshine Landfill

Landair Surveys has provided ongoing support for Sunshine Landfill operations through monthly ground surveys and half-yearly whole-site flyovers.

Let’s get started.